Client:

Esterhazy Potash

Location:

K2 operation

Project Name:

Replace Headframe Bin Bottom sections

Project Description:

Esterhazy Potash required the upgrading and replacement of Headframe Bin Bottom sections.  An integral piece of equipment for the continuous operation of the K2 mine, it was critical that the fabrication and installation of the project was completed within the allotted time. There were two bin bottoms that needed to be replaced, one was during the summer shutdown of 2009 and the other during summer shutdown 2010.  Both projects were completed as planned and on time.

Completion Date:

one summer shutdown 2009

one summer shutdown 2010

Website by Look Agency
Copyright 2018 EMW